01 March 2024
The pilot plant was set up at the Bari-West AQP wastewater treatment plant near the primary sedimentation tank. The installation involved connecting the plant to the existing hot water circuit and boiler, as well as setting up the post-treatment unit for the final sludge and an external polymer dosing system.












