Skip to content
Twitter page opens in new windowLinkedin page opens in new windowFacebook page opens in new windowYouTube page opens in new window
Media Contents
Life Biolubridge
Biolubricants from urban sewage sludge
Life BiolubridgeLife Biolubridge
  • Home
  • About Us
  • Status
Search:
  • Team
  • News & Events
  • Contacts
  • English
    • Italian
  • About Us
  • Status
  • News & Events
  • Team
  • Media Contents
  • Contacts
  • English
  • Italian

Daily Archives: 1 March 2024

Installation of the Lipids Recovery Unit on site

NewsBy Fratelli Parodi1 March 2024Leave a comment

01 March 2024 The pilot plant was set up at the Bari-West AQP wastewater treatment plant near the primary sedimentation tank. The installation involved connecting the plant to the existing hot water circuit and boiler, as well as setting up the post-treatment unit for the final sludge and an external polymer dosing system.

Life Biolubridge

Copyright 2022 LIFE BioLubridge - LIFE20 ENV/IT/000452 | All rights reserved | Powered by Warrant Hub S.p.A.

Go to Top